
Due to our nature of business, we have set up own steel fabrication yard at Seelong, Senai area.
With overall 3 arces, equipped with steel fabrication equipments, lifting cranes, welding machines, cutting and hole cutter.
Together with our in-house fabricators and welders, we are able to output a minimum 500 ton per month.

Completed and Ongoing Steel Structure Project:
Ye Chiu Non Ferrous Metal (M) Sdn. Bhd. Project

D&Y Textile (M) Sdn. Bhd. Project

CHH Pacific Sdn. Bhd. Project

KIP Group Project



Ensafe System Sdn. Bhd. Project

Intro-Mold Precision Engineering Sdn. Bhd. Project

LHL Corporation Sdn. Bhd. Project

MMHE Oil & Gas Project

Oleochemical Factory, Pasir Gudang Project

Heng Hiap Industries Sdn. Bhd.


Kulai Bus Terminal Project

Fineguard Project, Tanjung Langsat


Proposed 64 units 3 Storey and 4 Storey Shop Office PTD 5532, Kawasan Perindustrian (SILC) Nusajaya, mukim Jelutong, daerah Johor Bahru, Johor Darul Takzim untuk tetuan S.K. Tiong Sdn. Bhd

Cadangan Pembinaan Yang Mengandungi, 1 Unit Kilang Setingkat Beserta Pejabat 1 dan 3 Tingkat, 1 Unit Kilang Setingkat Beserta Pejabat 2 dan 3 Tingkat, 1 Unit Bilik Kawalan, 1 Unit Kebuk Sampah, Di Tanjung Langsat, Mukim Sungai Tiram.
`
Cadangan Pembangunan Industri Sederhana at Taman Perindustrian Sedernak, Mukim Serdenak, Kulai Jaya.
Completed 64 UNITS 3-STOREY SHOP OFFICE, JALAN SERANGKAI 11, TAMAN BUKIT DAHLIA, MUKIM PLENTONG, DAERAH JOHOR BAHRU, JOHOR FOR M/S POWER ROOT NNERGY SDN BHD

The proposed phase 3, Taman Dato Chellam Mukim Tebrau, Daerah Johor Bahru for M/S Panoramic Jaya Sdn. Bhd. construction, completion and maintenance of 21 units 20' x 70' (Type A) double storey terrace houses, 2 units 22' x 70' (Type A) double storey terrace houses, 56 units 20' x 70' (Type B) double storey terrace houses, 3 units 22' x 70' (Type B) double storey terrace houses